This bidding project has been approved by relevant departments for construction. The construction funds come from self-raised funds, and the project investment ratio is 100%. The bidder is Shandong Luneng Cable Co., Ltd. The project has met the bidding conditions and is now open for bidding.
Project name: Luneng Intelligent Power Transmission and Transformation Manufacturing Base Project Intelligent Environmentally Friendly Combined Electrical Appliance Manufacturing Center and High-Efficiency Environmentally Friendly Transformer Supporting Center Civil Engineering Project
Construction location: This project is located east of Boyang Road, Economic Development Zone, Taishan District, and south of Xieguocheng Street.
Project scale: This project is the civil engineering project of the intelligent environmental protection combined electrical appliance manufacturing center and high-efficiency environmental protection transformer supporting center of the Luneng intelligent power transmission and transformation manufacturing base project. The main contents include: high-efficiency environmental protection transformer supporting center (building area of about 17384.99 square meters), intelligent environmental protection combined electrical appliance manufacturing center (building area of about 17818.97 square meters), hazardous chemicals warehouse (building area of about 166.86 square meters), hazardous waste room (building area of about 69.66 square meters), restaurant (building area of about 1854.92 square meters), guard room (building area of about 65.45 square meters) earthwork, foundation engineering, main engineering, masonry engineering, roofing engineering, waterproof engineering, insulation engineering, ground cushion, wall plastering, water supply and drainage engineering and other engineering and related reserved and embedded engineering of the above unit engineering related to strong electricity, weak electricity, ventilation, heating, power, fire protection engineering, etc. For details, please refer to the drawings and bill of quantities.
Planned construction period: 200 calendar days. The specific start time shall be subject to the written start notice of the contractor.
Bidding scope: Construction and warranty of the project within the scope of the construction drawings (see the drawings and bill of quantities for details).
Quality target: Comply with the qualified standards of the "Construction Quality Acceptance Code for Construction Projects" and the relevant requirements of the tenderer.
Bidding date: Expected to be mid-February 2023.
Copyright?TAIAN TAISHAN HIGH VOLTAGE SWITCH CO.. LTO LuICP No.09101201-1